Jump to content

Ethan Allen Express

This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia

Ethan Allen Express
A passenger train with a diesel locomotive at a grade crossing
The Ethan Allen Express departing Burlington in July 2022
Overview
Service typeIntercity rail
First serviceDecember 2, 1996
Current operator(s)Amtrak
Annual ridership88,981 (FY24) Increase 2.7%[a][1]
Route
TerminiNew York City
Burlington, Vermont
Stops15
Distance travelled310 miles (500 km)
Average journey time7 hours, 35 minutes[2]
Service frequencyOne daily round trip
Train number(s)290, 291[3]
On-board services
Class(es)Coach, business
Disabled accessAll cars, all stations
Catering facilitiesCafé car
Technical
Rolling stockAmfleet coaches
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Operating speed41 mph (66 km/h) (avg.)
110 mph (180 km/h) (top)
Track owner(s)Amtrak, CPKC, CSX, MNRR, VTR
Route map
0 mi
Burlington
21 mi
34 km
Ferrisburgh–Vergennes
34 mi
55 km
Middlebury
67 mi
108 km
Rutland
Train reverses
78 mi
126 km
Castleton
82 mi
132 km
Fair Haven
Closed 2010
113 mi
182 km
Fort Edward
131 mi
211 km
Saratoga Springs
151 mi
243 km
Schenectady
169 mi
272 km
Albany–Rensselaer
196 mi
315 km
Hudson
222 mi
357 km
Rhinecliff
237 mi
381 km
Poughkeepsie
278 mi
447 km
Croton–Harmon
296 mi
476 km
Yonkers
310 mi
499 km
New York City enlarge…
NJ Transit

Handicapped/disabled access all stations accessible

The Ethan Allen Express is a daily passenger train operated by Amtrak in the United States between New York City and Burlington, Vermont, via Albany, New York. One daily round trip is operated on a 310-mile (500 km) north–south route with a 7-hour 35 minute scheduled running time. The train is subsidized by New York and Vermont for the portion north of Albany. It is named for Vermont cofounder and American Revolutionary War hero Ethan Allen.

Ethan Allen Express service began on December 2, 1996, acting as an extended Empire Service train. It was the first passenger service to Rutland since 1953 and the first to use the line between Rutland and Whitehall since 1934. The train's schedule has been adjusted a number of times, particularly in the early years of its operation, in an attempt to serve both tourists to Vermont and Vermonters traveling to New York City. From February 1998 to April 2002, a second northbound trip was operated – at some times only a shuttle service from Albany.

An infill station in Fair Haven, Vermont, was added in November 1997; it was replaced with a stop in nearby Castleton in January 2010. Service north of Albany was suspended from March 2020 to July 2021 due to the COVID-19 pandemic. An extension to Burlington, Vermont, with new stations in Middlebury and Vergennes began service on July 29, 2022. Further proposed expansions include a second daily train running via North Bennington, Vermont; an extension to Essex Junction, Vermont, to connect with the Vermonter; and additional infill stations and higher speeds in Vermont.

Operation

[edit]

Route

[edit]

The Ethan Allen Express operates approximately north–south between New York Penn Station and Burlington, save for an approximately east–west section between Whitehall, New York, and Rutland, Vermont. All of the route south of Whitehall is also used by the Adirondack. The stretch between Schenectady and New York City is also used by Empire Service, Lake Shore Limited, and Maple Leaf trains; the Ethan Allen Express acts as an additional Empire Service trip on this portion.[4]: 19  The train is scheduled for 7 hours 35 minutes between New York City and Burlington. Northbound trips depart in the early afternoon; southbound trips depart in the late morning.[2]

The train operates over the following trackage:[4]: 19 

The Ethan Allen Express operates as higher-speed rail on the Hudson Subdivision, with speeds up to 110 mph (180 km/h).[5][6] Maximum speeds are 80 mph (130 km/h) on the Hudson Line, 60 mph (97 km/h) on the Empire Connection, 50 mph (80 km/h) on the Freight Subdivision, 60 mph (97 km/h) on the Canadian Subdivision, and 59 mph (95 km/h) on the Vermont Railway.[6][7][4]: 19–27 

Equipment

[edit]
A typical Ethan Allen Express train in New York City

Ethan Allen Express trains typically have five Amfleet passenger cars: four coaches plus a club car with 2x1 business class seating and a cafe area.[8] Trains operate with two GE P32AC-DM dual-mode locomotives, one at each end, which operate on third rail electric power in Penn Station and the Empire Connection tunnel and on diesel power for the rest of the route.[9]

In the late 2020s and early 2030s, all equipment will be replaced with Amtrak Airo trainsets, the railroad's branding of its combination of Siemens Venture passenger cars and a Siemens Charger diesel-electric locomotive.[10] The trainsets for the Ethan Allen Express will have six passenger cars, which will include a cab control car food service area and a mix of 2x2 coach and 2x1 business class seating. The car closest to the locomotive will have batteries to supply electricity to traction motors in the locomotive when operating in Penn Station and the Empire Connection tunnel, eliminating the need for third rail propulsion.[11]

Ridership and funding

[edit]

Ridership in Fiscal Year 2021[a] (which included only three months of service north of Albany) was 12,456. Ridership in Fiscal Year 2019 – the last full pre-pandemic fiscal year of operations – was 50,515.[1] The train is subsidized by New York and Vermont for the portion north of Albany, in proportion to mileage on that section in each state. In FY 2019, the Vermont portion of the subsidy (44%) was $1.57 million, while the New York portion was about $2 million.[12][4]: 164 

The Vermont Agency of Transportation subsidizes discounted fares for most intra-Vermont travel on the route.[13] The route is supplemented by two daily bus round trips operated by Vermont Translines between Albany and Burlington which act as Amtrak Thruway connections to Empire Corridor trains at Albany–Rensselaer. These bus routes also provide Amtrak connections for several Vermont towns presently without direct Amtrak service, such as Bennington and Manchester.[14]

History

[edit]

Planning and service start

[edit]
A postcard view of a large railway station
The former station in Rutland, served by the Rutland Railway until 1953

Prior passenger service between Rutland and points south was operated by the Delaware and Hudson Railroad over the Whitehall Branch (Rutland–Whitehall) and Washington Branch (CastletonEagle Bridge) and by the Rutland Railroad over its mainline (Bellows Falls–Rutland–Burlington) and Chatham Branch (Rutland–Chatham). Washington Branch and Whitehall Branch passenger service ended on June 24, 1934.[15][16] The Rutland Railroad continued to operate passenger service to Rutland, including the New York City–Montreal Green Mountain Flyer and Mount Royal, until 1953.[17] After the Rutland filed to abandoned its entire system in 1963, the state-owned Vermont Railway took over freight service on most of the lines in 1964. The Central Vermont Railway continued to operate the Montrealer, providing passenger service to the eastern and northern parts of the state, until 1966. Amtrak took over intercity passenger service in the United States in 1971 and resumed the overnight Montrealer in 1972.[17]

Politicians including Curtis McCormack unsuccessfully attempted to obtain funding for Amtrak service to Rutland in the 1980s. Then-governor Howard Dean created the Vermont Rail Council headed by McCormack in 1991, with instruction to study Rutland service, but most attention was focused on the Montrealer.[18] In late 1994, Amtrak announced that the Montrealer would be discontinued due to budget cuts. While state officials worked to retain that service, adding a route to Rutland (and possibly Burlington) was also supported by Dean.[18] In April 1995, the Montrealer was cut back to St. Albans as the state-subsidized Vermonter on a daytime schedule.[19] Later than month, $3.5 million was included in a federal funding bill. Along with $1 million from the Vermont Railway and $743,000 from the state, this funded $5.24 million in trackwork, which upgraded 21 miles (34 km) of the Whitehall Branch from 25 miles per hour (40 km/h) to 59 miles per hour (95 km/h) maximum speed.[20][21]

The state originally planned to call the new service the Green Mountain Flyer after the former Rutland Railroad train. However, the Green Mountain Railroad objected, as they already used that name for a tourist train. On August 15, 1996, the state announced it would be called the Ethan Allen Express after Vermont cofounder and American Revolutionary War patriot Ethan Allen.[22] The state agreed to a $200,000 annual subsidy, which reflected the cost of extending one Empire Service round trip from Albany to Rutland.[20] Service began with the northbound trip on December 2, 1996, with the first southbound trip the following day.[23][24] The Ethan Allen Express began with stops in Rutland, Fort Edward, Saratoga Springs, Schenectady, Albany–Rensselaer, Hudson, Rhinecliff, Poughkeepsie, Croton, Yonkers and New York City.[25] Because the Adirondack already served the section between New York City and Whitehall, the Ethan Allen Express only added 44 route miles (71 km) and one station (Rutland) to the Amtrak system.[26] A trailer was used as a temporary station at Rutland; the station building, funded by $700,000 from the federal government, did not open until 1999.[18][27]

Early service changes

[edit]
A passenger train approaching a small brick station
The Ethan Allen Express at Rutland in 2001

The Ethan Allen Express was intended to support tourism in the Rutland areas, particularly winter travel to Killington Ski Resort and Pico Mountain.[24] The train's schedule has been adjusted a number of times, particularly in the early years of its operation, in an attempt to serve both tourists to Vermont and Vermonters traveling to New York City.[26] The initial schedule had a running time slightly over five hours, with afternoon departures from both terminals on weekdays. Saturday southbound trains departed Rutland at 7:05am to allow for weekend trips to New York City, while Sunday trains in both directions departed in the later afternoon to accommodate weekend trips.[26][28]

In October 1997, the southbound Saturday departure moved to the same afternoon time as weekdays, while the Friday and Sunday northbound departures moved to the late-afternoon time.[26][29] An infill station at Fair Haven was added on November 12, 1997.[29][30] On February 15, 1998, Amtrak added a morning northbound train from Albany to Rutland, providing a connection from the northbound Maple Leaf; this gave a second northbound trip to Rutland, though still only one southbound trip. The change reduced the state subsidy by eliminating the need for overnight crew accommodations: the morning northbound trip turned around to become the afternoon southbound trip, while the afternoon northbound trip deadheaded from Rutland to Albany in the late evening for servicing.[26][31][32]

In October 1998, the Sunday southbound departure was shifted two hours later to allow more time for skiers, while the Saturday southbound departure was moved up to match weekdays.[33][34] From August 16 to October 31, 1999, the Vermont Railway operated the Ethan Allen Connection between Rutland and Burlington with an intermediate stop at Middlebury.[35] It was discontinued due to low ridership; most passengers only rode between Rutland and Burlington, with just 20–25% connecting to the Ethan Allen Express.[36] On October 31, northbound service was reconfigured. A daily train departed New York at 6:15 am – an hour earlier than the Maple Leaf. The afternoon northbound train continued to run Monday–Thursday; the Saturday northbound shifted to that time, while the Sunday afternoon northbound was canceled. The Friday northbound trip became an express operating nonstop between New York and Schenectady, with a 4+12 hour schedule – the fastest time ever scheduled for the Ethan Allen Express.[26][37]

A baggage car was added to the train for bikes and ski equipment in late 1998, but it could not be used for luggage until February 2000 when an attendant was hired for Rutland station.[38][39] The baggage car was removed in 2002 due to low usage, elimination of station agents due to state budget cuts, and the older baggage cars not being certified for as high speeds as the rest of the train.[40][41] The schedule was simplified on April 29, 2001: daily afternoon trips in both direction, plus a morning Albany–Rutland northbound trip with no New York connection.[26][42] The morning trip became a New York–Rutland trip on July 9, while the Sunday trip was again moved to later in the afternoon.[26][43] The morning trip was cut back to an Albany–Rutland shuttle in January 2002 and discontinued entirely that April.[26][44][45] In April 2003, the Friday northbound trip was moved later in the evening, while weekday southbound trips were moved to a 7:15 am departure.[26][46] Monday and Saturday southbound departures were moved to 10:45 am in November 2004.[26][47] The Monday southbound trip was moved back to match the other weekdays in October 2007.[26][48]

Further changes

[edit]
A large wooden train station building
Castleton station (pictured) replaced Fair Haven station in January 2010

In October 2008, the Vermont Agency of Transportation (VTrans) proposed eliminating the Ethan Allen Express and replacing it with a bus, citing budgetary restrictions. The proposal was rejected by a legislative committee.[49] VTrans again proposed ending service in January 2009.[50] Opposition from the Vermont Rail Action Network and local political leaders resulted in the service being kept.[51][52][53] On January 2, 2010, the Ethan Allen Express began stopping at Castleton. Service to Fair Haven ended on January 9.[54]

Beginning in the mid-2000s, poor track conditions between Whitehall and Rutland also affected the train's performance. In February 2011, VTrans began an investigation into the Vermont Rail System's handling of the Ethan Allen Express after Amtrak ranked VRS as the worst host railroad in the country.[55] On-time performance of the train was below 70% by that time, with track conditions responsible for 91% of delays.[55] Vermont Rail Systems began track work in April 2011, which reduced travel times by 10 minutes by that October. The project, funded by both the railroad and the state of New York at a cost of $3.25 million, involved rebuilding about 8 miles (13 km) of track and eight grade crossings.[56] By February 2012, additional trackwork had resulted in a 15-minute southbound and 25-minute northbound reduction in travel time between Rutland and Whitehall.[57]

The Friday northbound trip operated on the same mid-afternoon schedule from July 10 to September 5, 2017, during track work at New York Penn Station.[26][58] From May 26 to September 3, 2018, the Ethan Allen Express and other Empire Corridor trains were diverted to Grand Central Terminal during further Penn Station track work.[26][59] On March 26, 2020, the Ethan Allen Express was suspended north of Albany–Rensselaer at the request of Vermont Governor Phil Scott due to the COVID-19 pandemic.[60][61] Service to Rutland resumed on July 19, 2021, with $1 promotional fares on that date for travel within Vermont.[62][63]

Extension to Burlington

[edit]
A large railroad station building in an urban area
Union Station in Burlington, Vermont, became the northern terminus of the Ethan Allen Express in July 2022.

Even before service began, state planners intended to later extend the Ethan Allen Express from Rutland to Burlington.[21][64] In 2005, Senator Jim Jeffords obtained a $30 million earmark for upgrades to the Rutland–Burlington rail corridor in preparation for a possible Ethan Allen Express extension. Jeffords had long championed passenger rail in western Vermont, which does not have an interstate highway. His original goal was New York–Burlington service via Bennington.[64][65] The Vermont Agency of Transportation (VTrans) applied three times for American Recovery and Reinvestment Act of 2009 funds to rebuild the tracks between Rutland and Burlington; none of the applications were successful.[66][65]

The state received $9 million in Transportation Investment Generating Economic Recovery funds for the project in 2013, and an additional $10 million in 2015. This completed funding for the $26 million project, which included rebuilding 20 miles (32 km) of track to allow speeds of 40 mph (64 km/h) for freight and 60 mph (97 km/h) for passenger trains between Rutland and Burlington. Other work included the construction of stations at Middlebury and Ferrisburgh–Vergennes, a new platform at Burlington Union Station, adding crossovers and passing sidings, improving grade crossings, and rebuilding a wye at Rutland.[67][68] The former New Haven Junction station building was relocated, as it was too close to the tracks.[69] A separately-funded project constructed a rail tunnel in downtown Middlebury to replace aging bridges and increase clearances for freight use.[70]

VTrans originally planned for trains to lay over overnight at Union Station, but nearby residents objected to having the locomotive idle there. In March 2020, VTrans indicated that the Vermont Railway yard to the south would instead be modified to accommodate the train.[71] The two new stations and the new Burlington platform were built in 2020–2022.[70][72][73] In October 2021, Amtrak and Vermont Rail System began running qualification trips between Rutland and Burlington to familiarize train crews with the new route.[74] Revenue service to Burlington began on July 29, 2022, with trains departing early afternoon northbound and late morning southbound all days.[2] It was the first direct passenger rail service to Burlington in 69 years.[14] The first day of service was marred by a temporary suspension of all Amtrak service west of Albany caused by a deteriorating trackside structure, the Central Warehouse, in North Albany. Passengers were bussed between Saratoga Springs and Albany–Rensselaer.[75] The extension caused an immediate increase in ridership, with August 2022 ridership about 50% higher than August 2019.[76]

Future

[edit]

VTrans listed several possible improvements to the Ethan Allen Express in the 2021 Vermont Rail Plan. These included potential infill flag stops in Brandon and Shelburne.[77]: 41  Positive train control and track upgrades would allow the Ethan Allen Express to reach speeds of 79 mph (127 km/h), up from 59 mph (95 km/h), on sections between Whitehall and Burlington. This would save about 15 minutes per trip, with an estimated increase of 1,400 to 2,600 annual riders by 2040.[78]: 17–19  VTrans also analyzed a possible 7.8 mi (12.6 km) extension of the Ethan Allen Express from Burlington to Essex Junction via the New England Central Railroad Winooski Branch, where transfer could be made with the Vermonter. The branch would first have to be upgraded to increase its current passenger train speed limit of 15 mph (24 km/h).[77]: 40  This would attract between 4,900 and 7,800 additional riders per year by 2040 (assuming the Vermonter is extended to Montreal).[78]: 15–17 

In 2014, VTrans and the New York State Department of Transportation studied the potential serving southwestern Vermont either with a second daily train or rerouting the Ethan Allen Express. The proposed alternative was to extend an Empire Service train to Rutland, operating on a more southern route than the Ethan Allen Express between Glenville, New York and Rutland. It would use existing Canadian Pacific Railway (now Canadian Pacific Kansas City), Pan Am Railways (now CSX Transportation), and Vermont Railway freight lines, with new intermediate stops at Mechanicville, New York, North Bennington, Vermont, and Manchester, Vermont.[4] The 2021 Vermont Rail Plan indicated that should it be implemented, this second service would also extend to Burlington.[78]: 8–10 

In December 2023, the Federal Railroad Administration accepted an application by VTrans to enter the New York–Albany–Mechanicville–Bennington–Rutland–Burlington route into its Corridor Identification and Development Program. The program grants $500,000 toward service planning and prioritizes the route for future federal funding. The application referred to the route as the Green Mountain Corridor.[79]

Station stops

[edit]
State Location Miles (km)[3] Station[3] Connections
VT
Burlington 0 Burlington Bus transport Green Mountain Transit
Ferrisburgh 21 (34) Ferrisburgh–Vergennes Bus transport Tri-Valley Transit, Vermont Translines
Middlebury 34 (55) Middlebury Bus transport Tri-Valley Transit
Rutland 67 (108) Rutland Bus interchange MVRTD "The Bus"
Castleton 78 (125) Castleton Bus interchange MVRTD "The Bus"
Fair Haven 82 (133) Fair Haven Closed January 9, 2010
NY Fort Edward 113 (182) Fort Edward–Glens Falls Amtrak Amtrak: Adirondack
Bus interchange Greater Glens Falls Transit
Saratoga Springs 131 (211) Saratoga Springs Amtrak Amtrak: Adirondack
Bus interchange Capital District Transportation Authority
Schenectady 151 (243) Schenectady Amtrak Amtrak: Adirondack, Empire Service, Lake Shore Limited, Maple Leaf
Bus interchange Capital District Transportation Authority
Rensselaer 169 (272) Albany–Rensselaer Amtrak Amtrak: Adirondack, Berkshire Flyer, Empire Service, Lake Shore Limited, Maple Leaf
Bus interchange Capital District Transportation Authority
Bus interchange Vermont Translines, Megabus (North America) Megabus
Hudson 196 (316) Hudson Amtrak Amtrak: Adirondack, Berkshire Flyer, Empire Service, Maple Leaf
Bus interchange Columbia County Public Transportation
Rhinecliff 222 (357) Rhinecliff Amtrak Amtrak: Adirondack, Berkshire Flyer, Empire Service, Maple Leaf
Poughkeepsie 237 (382) Poughkeepsie Amtrak Amtrak: Adirondack, Berkshire Flyer, Empire Service, Maple Leaf
Metro-North Railroad:  Hudson Line
Bus interchange Ulster County Area Transit, Dutchess County Public Transit
Croton-on-Hudson 278 (447) Croton–Harmon Amtrak Amtrak: Adirondack, Berkshire Flyer, Empire Service, Lake Shore Limited, Maple Leaf
Metro-North Railroad:  Hudson Line
Bus interchange Bee-Line
Yonkers 296 (476) Yonkers Amtrak Amtrak: Adirondack, Berkshire Flyer, Empire Service, Maple Leaf
Metro-North Railroad:  Hudson Line
Bus interchange Bee-Line
New York City 310 (499) New York Penn Station Amtrak Amtrak (long-distance): Cardinal, Crescent, Lake Shore Limited, Palmetto, Silver Meteor
Amtrak Amtrak (intercity): Acela, Adirondack, Berkshire Flyer, Carolinian, Empire Service, Keystone Service, Maple Leaf, Northeast Regional, Pennsylvanian, Vermonter
LIRR:  City Terminal Zone,  Port Washington Branch
NJ Transit NJ Transit:  North Jersey Coast Line,  Northeast Corridor Line,  Gladstone Branch,  Montclair-Boonton Line,  Morristown Line
NYC Subway: "1" train"2" train"3" train"A" train"C" train"E" train
Port Authority Trans-Hudson PATH: HOB-33 JSQ-33 JSQ-33 (via HOB)
Bus interchange NYC Transit Bus

Notes

[edit]
  1. ^ a b Amtrak's Fiscal Year (FY) runs from October 1 of the prior year to September 30 of the named year.

References

[edit]
  1. ^ a b "Amtrak Fiscal Year 2024 Ridership" (PDF). Amtrak. December 3, 2024. Retrieved December 3, 2024.
  2. ^ a b c Delabruere, Dan (June 16, 2022). "Agency of Transportation Announces Start Date for Long-Awaited Amtrak Service in Burlington, Vergennes, and Middlebury" (PDF). Vermont Agency of Transportation.
  3. ^ a b c "Ethan Allen Express" (PDF). Amtrak. March 16, 2020.
  4. ^ a b c d e "New York – Vermont Bi-State Intercity Passenger Rail Study: Service Development Plan" (PDF). Vermont Agency of Transportation. July 2014.
  5. ^ "Berkshire Flyer: Pittsfield-New York City Feasibility Study". Massachusetts Department of Transportation. March 26, 2018. p. 11.
  6. ^ a b "Frequently Asked Questions". Empire State Passenger Association.
  7. ^ "Discussion Points for 110 MPH vs. 125 MPH Maximum Speed for PRIIA Dual Mode (DC 3rd Rail) Requirements Document" (PDF). PRIIA Locomotive Working Group. November 20, 2014. Archived from the original (PDF) on June 27, 2022. Retrieved June 15, 2022.
  8. ^ Angelo, Lilly St (March 23, 2022). "Amtrak expected to begin route from Burlington to New York in July". The Burlington Free Press. Retrieved March 30, 2022.
  9. ^ Vermont Agency of Transportation (January 2010). "Passenger Rail Equipment Options for the Amtrak Vermonter and Ethan Allen Express" (PDF). Vermont Legislature. Retrieved December 29, 2014.
  10. ^ "Introducing Our New Trains: Amtrak Airo". Amtrak. December 15, 2022. Retrieved December 15, 2022.
  11. ^ "Amtrak FY 2022–2027 Asset Line Plan" (PDF). Amtrak. p. 132. Retrieved April 11, 2022.
  12. ^ "Prioritization and Investment Program Memo" (PDF). Vermont Freight and Rail Plan. Vermont Agency of Transportation. p. 29.
  13. ^ "Passenger Rail Service". Vermont Agency of Transportation. September 1, 2022. Archived from the original on September 29, 2022.
  14. ^ a b Carl Fowler (August 4, 2022). "Riding the Amtrak Ethan Allen Express". Rail Passengers Association.
  15. ^ "D. & H. To Suspend Passenger Trains To And From City". Rutland Daily Herald. May 26, 1934. p. 1 – via Newspapers.com.
  16. ^ "Plan New Bus Lines". The Enterprise and Vermonter. June 15, 1934. p. 7 – via Newspapers.com.
  17. ^ a b Lindsell, Robert M. (2000). The Rail Lines of Northern New England. Branch Line Press. pp. 35–46, 175. ISBN 0-942147-06-5.
  18. ^ a b c Bever, Frederick (December 2, 1996). "Rail Backers Had to Try, Try Again". Rutland Daily Herald. pp. 11, 13 – via Newspapers.com.
  19. ^ Bever, Frederick (March 18, 1995). "State Seals Train Deal". Rutland Daily Herald. pp. 1, 12 – via Newspapers.com.
  20. ^ a b "Rutland Train Funds are Set". Rutland Daily Herald. April 26, 1996. pp. 1, 3 – via Newspapers.com.
  21. ^ a b Daley, Fred (April 28, 1996). "New train will link local area with NYC". The Post-Star. pp. 1, 7 – via Newspapers.com.
  22. ^ Wallace Allen, Anne (August 16, 1996). "NYC-to-Rutland Train is Ethan Allen Express". Rutland Daily Herald. pp. 1, 4 – via Newspapers.com.
  23. ^ "In Amtrak History" (PDF). Amtrak Ink. 18 (11). December 2013. Archived from the original (PDF) on July 19, 2014.
  24. ^ a b Edwards, Bruce (December 2, 1996). "Ethan Allen Express Rolls In Tonight". Rutland Daily Herald. pp. 1, 4 – via Newspapers.com.
  25. ^ "Amtrak Northeast Timetable". Amtrak. November 10, 1996. p. 24 – via Museum of Railway Timetables.
  26. ^ a b c d e f g h i j k l m n Warner, David C.; Goldberg, Bruce (2021). Fifty Years of Amtrak Trains: A Comprehensive Survey of Amtrak Routes: 1971–2021. Bucklin, Missouri: White River Productions. pp. 56–57. ISBN 978-1-932804-70-6.
  27. ^ "Rutland, VT (RUD)". Great American Stations. Amtrak.
  28. ^ "Amtrak Northeast Timetable". Amtrak. July 10, 1997. p. 26 – via Museum of Railway Timetables.
  29. ^ a b "Amtrak Northeast Timetable: Fall/Winter 1997–98". Amtrak. October 26, 1997 – via Museum of Railway Timetables.
  30. ^ Edwards, Bruce (November 8, 1997). "Ethan Allen Express Soon Starting to Stop in Fair Haven". Rutland Daily Herald. p. 8 – via Newspapers.com.
  31. ^ Bever, Frederick (January 17, 1998). "Rutland Gets Second Train". Rutland Daily Herald. p. 1 – via Newspapers.com.
  32. ^ "Amtrak Northeast Timetable". Amtrak. April 5, 1998. p. 22 – via Museum of Railway Timetables.
  33. ^ "Amtrak Northeast Timetable: Fall/Winter 1998–99". Amtrak. October 25, 1998. p. 28 – via Museum of Railway Timetables.
  34. ^ "Amtrak promotes Vermont ski tours". The Burlington Free Press. October 14, 1998. p. 3B – via Newspapers.com.
  35. ^ "Ethan Allen Connection [Advertisement]". Rutland Daily Herald. September 3, 1999. p. 41 – via Newspapers.com.
  36. ^ Keays, Alan J. (October 13, 1999). "'Connection' Is Nearing End Of Line". Rutland Daily Herald. pp. 13, 15 – via Newspapers.com.
  37. ^ "Amtrak Northeast Timetable: Fall/Winter 1999–2000". Amtrak. October 31, 1999. p. 30 – via Museum of Railway Timetables.
  38. ^ Keays, Alan J. (January 16, 1999). "The Express Still Has A Few Bugs". Rutland Daily Herald. p. 8 – via Newspapers.com.
  39. ^ Keays, Alan J. (February 4, 2000). "Rail depot staffed; baggage car can be used". Rutland Daily Herald. p. 8 – via Newspapers.com.
  40. ^ Allen, Anne Wallace (November 8, 2002). "Passenger rail contract proposed". Rutland Daily Herald. p. 15 – via Newspapers.com.
  41. ^ Edwards, Bruce (July 26, 2004). "Vt. pays $2.5 million to keep Amtrak". Rutland Daily Herald. pp. C1, C10 – via Newspapers.com.
  42. ^ "Amtrak National Timetable: Spring–Summer 2001". Amtrak. April 29, 2001. p. 25 – via Museum of Railway Timetables.
  43. ^ "Amtrak Northeast Timetable: Summer 2001". Amtrak. July 9, 2001. p. 38 – via Museum of Railway Timetables.
  44. ^ "Amtrak Northeast Timetable: Winter–Spring 2002". Amtrak. January 28, 2002. p. 32 – via Museum of Railway Timetables.
  45. ^ "Amtrak Northeast Timetable: Spring–Summer 2002". Amtrak. April 29, 2002. p. 36 – via Museum of Railway Timetables.
  46. ^ "Amtrak Northeast Timetable: Spring–Summer 2003". Amtrak. April 28, 2003. p. 36 – via Museum of Railway Timetables.
  47. ^ "Amtrak System Timetable: Fall 2004 | Winter 2005". Amtrak. November 1, 2004. p. 67 – via Museum of Railway Timetables.
  48. ^ "Amtrak System Timetable: Fall Winter 2007–08". Amtrak. October 29, 2007. p. 64 – via Museum of Railway Timetables.
  49. ^ "Ethan Allen Safe...Until January". Vermont Rail Action Network. December 18, 2008. Archived from the original on March 4, 2016.
  50. ^ Hirschfeld, Peter; Peters, Stephanie M. (January 20, 2009). "Amtrak rally draws 200 people". Rutland Herald. Archived from the original on June 15, 2018.
  51. ^ Hirschfield, Peter (February 26, 2009). "Official softens stance on Amtrak". Rutland Herald. Archived from the original on April 12, 2018.
  52. ^ "2009 Vermont Rail Action Network Accomplishments". Vermont Rail Action Network. November 25, 2009. Archived from the original on April 24, 2012.
  53. ^ Peters, Stephanie M. (January 10, 2009). "State panel, county delegation speak against Amtrak bus service". Rutland Herald. Archived from the original on June 15, 2018.
  54. ^ "Amtrak Ethan Allen Express to Provide Service at Renovated Castleton, Vermont Depot" (PDF) (Press release). Amtrak. December 29, 2009.
  55. ^ a b "Amtrak ranks Vermont last as worst railroad". The Burlington Free Press. February 24, 2011. Archived from the original on July 30, 2012.
  56. ^ "Vermont Rail System posts progress on trackwork for Amtrak's Ethan Allen service". Progressive Railroading. August 12, 2011. Retrieved July 6, 2022.
  57. ^ "Vermont Rail System's bolstered track improves Amtrak transit times". Progressive Railroading. February 8, 2012. Retrieved July 6, 2012.
  58. ^ "Amtrak System Timetable" (PDF). Amtrak. July 2017. p. 51.
  59. ^ "Amtrak Announces Summer Infrastructure Renewal Work" (Press release). Amtrak. April 10, 2018. Archived from the original on August 14, 2022. Retrieved July 7, 2022.
  60. ^ Anderson, Eric (March 26, 2020). "Vermont governor suspends Amtrak service to state, tells residents to stay home". Albany Times-Union. Retrieved July 6, 2022.
  61. ^ "Service Adjustments Due to Coronavirus" (Press release). Amtrak. April 6, 2020. Archived from the original on April 6, 2020.
  62. ^ "Vermont marking return of Amtrak service after COVID". AP News. July 19, 2021. Retrieved July 6, 2022.
  63. ^ "Amtrak and Vermont Agency of Transportation Celebrate Restoration of Vermont Trains With One Dollar Tickets, Half Off Summer Travel and Special Events" (Press release). Amtrak. July 13, 2021.
  64. ^ a b "Critics question whether money for rail in western Vermont is being well spent". Vermont Public Radio. May 15, 2008. Retrieved July 12, 2022.
  65. ^ a b Remsen, Nancy (August 21, 2011). "To Rutland by train: 68 miles and many millions of dollars". The Burlington Free Press. pp. 1B, 7B.
  66. ^ Hirschfeld, Peter (December 28, 2009). "Rutland to Burlington state rail service tied to stimulus". Barre Montpelier Times Argus. Archived from the original on August 26, 2018.
  67. ^ "USDOT announces $474 million in TIGER V grants". Progressive Railroading. September 6, 2013. Retrieved July 12, 2022.
  68. ^ "TIGER 2015 Awards" (PDF). United States Department of Transportation. p. 40.
  69. ^ "Vermont depot set to move Jan. 12". Trains. January 7, 2022. Retrieved January 7, 2022.
  70. ^ a b Flowers, John (December 23, 2021). "Middlebury rail project comes in on budget". Addison County Independent. Retrieved July 12, 2022.
  71. ^ "Vermont Agency of Transportation announces Amtrak Burlington train parking location" (PDF) (Press release). Vermont Agency of Transportation. March 12, 2020.
  72. ^ Bakuli, Ethan (January 27, 2021). "Progress on Burlington Amtrak service and bike path relocation moves along". The Burlington Free Press. Retrieved July 12, 2022.
  73. ^ "Amtrak to Burlington" (PDF). Vermont Agency of Transportation. 2022.
  74. ^ St. Angelo, Lilly (October 21, 2021). "Watch for trains: Amtrak's route to Burlington is doing practice runs". Burlington Free Press.
  75. ^ Hughes, Steve (July 29, 2022). "Crumbling Central Warehouse shuts down Amtrak service west of Albany". Times-Union. Retrieved July 29, 2022.
  76. ^ Hall, C.B. (October 23, 2022). "New Amtrak service makes a strong start". Vermont Biz. Retrieved November 7, 2022.
  77. ^ a b Vermont Rail Plan (PDF). Vermont Agency of Transportation. May 2021.
  78. ^ a b c "Vermont Rail Plan: Passenger Rail Forecasting Scenarios" (PDF). Vermont Rail Plan. Vermont Agency of Transportation. May 2021.
  79. ^ "FY22 Corridor Identification and Development Program Selections" (PDF). Federal Railroad Administration. December 2023. p. 11.
[edit]